KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  6-19-2010
Number of Hours:  6.00
Manual Reference:  none
Brief Description:  Junction Box Completed

June 19th 2010

Continued wiring the Affinity Grip Sticks. (Completed At last) I decided to use a junction box (D-25 Sub Connectors) that consisted of 1 pilot input, 1 co-pilot input and 1 panel output. This allows for maintenance of the grip sticks if necessary and I only need 1 17 conductor cable run to the panel. Also I received a single Relay Board from Affinity that I am going to connect the electric fuel pump to. The junction box mounts under the co-pilot seat. Anyway this setup is how the pro’s do it.

Time about 6 hours because of the D-Sub Connectors and Fabricating the Junction Box.
' style=

Junction Box Completed

Junction Box Completed

' style=

What's In the Box 17 Connected D-Sub Miniture Wires Each

What's In the Box 17 Connected D-Sub Miniture Wires Each

' style=

Another Junction Box View

Another Junction Box View

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.