KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  6-27-2010
Number of Hours:  5.00
Manual Reference:  n/a
Brief Description:  grip stick relays and some final electrical (avion

June 27th2010

Finished up with the grip stick relays and some final electrical (avionics) wiring and wing Molex connectors. Such as adding a cut-out switch to disable the “china man” hat switch and the flaps switch from the co-pilot (the wife) stick if I want to. (Safety reasons are why). On another subject, I have received a call from the freight trucking company and my Final RV-10 kit is set to arrive July 1st. The weight of the Final Kit was set a 391 lbs and the cost to ship from Van’s at Aurora (Portland), Oregon to the East coast was a modest $390 dollars. I guess the fuel surcharge is down this time of the year. So enough said, I should have PLENTY of work for the 4th of July and for about the next year.


Time about 5 hours
' style=

Electric Fuel Pump Board ( top ) and the Flaps and Trim Board ( bottom )

Electric Fuel Pump Board ( top ) and the Flaps and Trim Board ( bottom )

' style=

Flaps, Pitch and Roll from the Grip Stick to the Loads

Flaps, Pitch and Roll from the Grip Stick to the Loads

' style=

Pilot-CoPilot Jumction Box Mounted ( with co-pilot isolation switch )

Pilot-CoPilot Jumction Box Mounted ( with co-pilot isolation switch )

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.