KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
< Previous Log Entry          Next Log Entry >
' style=
Date:  6-8-2010
Number of Hours:  4.00
Manual Reference:  37 OP
Brief Description:  Continued wiring the electrical and the pane

June 3rd 2010:

Continued wiring the electrical and the panel…….
Time about 4 hours
' style=

Connected the Copper Bus Bar for the +12v Load Side (only a few more Switches to Wire)

Connected the Copper Bus Bar for the +12v Load Side (only a few more Switches to Wire)

' style=

Relay Buffer Board for the Flaps and Electric Fuel Pump Switches

Relay Buffer Board for the Flaps and Electric Fuel Pump Switches

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.