KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  11-25-2009
Number of Hours:  1.00
Manual Reference:  34 -2 Steps 4 to 8
Brief Description:  Section 34 BAGGAGE AREA … Page 34 -2 Steps 4 to 8

Section 34 BAGGAGE AREA … Page 34 -2 Steps 4 to 8

Step 4, Clecoed the Lower Frame F-1059C to the F-1059E Skin.

Step 5, I clecoed the Fwd Frame F-1059A, B to the F-1059E Skin.

Step 6, clecoed the Lock Bracket F-1059D to the F-1059E Skin.

Step 7, Clecoed the F-1059F Close-Out Panel to the three Frames.

Step 8, Final Drilled all the #30 and #40 holes in common.

Time about 1 hour.
' style=

Clecoing teh Baggage Door

Clecoing teh Baggage Door

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.