KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
< Previous Log Entry          Next Log Entry >
' style=
Date:  11-25-2009
Number of Hours:  1.00
Manual Reference:  34 -2 Step 1 to 3
Brief Description:  Section 34 BAGGAGE AREA … Page 34 -2 Steps 1 to

Section 34 BAGGAGE AREA … Page 34 -2 Steps 1 to 3

Step 1, I Match-Drilled #40 the nutplates attachment holes in all the nutplates found on the F-1006A, C, D Bulkhead and the F-1028 Baggage Bulkhead Channel as shown in figure 1.

Step 2, After deburring I dimpled the #40 holes for the nutplate attachment fittings. Then machine counter sunk the thick F-1027 Close Out panel and F1031 Upper Baggage Door Seal Channel.

Step 3, After adding a corresponding #40 dimple to both sides of the nutplates I riveted with AN426AD3-3.5 rivets the nutplates.

Time about 1 hour because I was working fast.
' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.