KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  11-18-2009
Number of Hours:  2.00
Manual Reference:  33 -6 Step1 to 2
Brief Description:  Section 33 BAGGAGE AREA … Page 33 -6 Steps 1 an

Section 33 BAGGAGE AREA … Page 33 -6 Steps 1 and 2

Step 1, I riveted the two K100-3 nutplates to the F-1031 Upper Baggage Door Seal Channel with AN426AD3-3.5 flush rivets.

Step 2, I riveted the two F-1024 Seat Floors L/R, F-1002A Baggage Floors L/R and the F-10103A Lower Seat Hinge Halves L/R as described in figure 2.

Time about 2 hours.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.