Brief Description: Section 33 BAGGAGE AREA … Page 33 -7 Steps 1 to
Section 33 BAGGAGE AREA … Page 33 -7 Steps 1 to 5
Step 1, I installed the K1000-08, K1100-08 and MS21051-L08 nutplates with the appropriate rivets as shown in figure 1.
Step 2, riveted both the F-1023B baggage Floor Angles to the F-1022A Baggage Floor and the F-1070 Mid Side Skins with CS4-4 and AN4326AD3-3.5 rivets.
Step 3, I riveted the F-1026 Lower Baggage Door Seal Channel and the F-10100B Baggage Door Shim to the Side Skins. And riveted the bottom tab-end with the appropriate CS4-4 rivets and the top inboard single rivet area with a LP4-3 rivet.
Step 4, I riveted the F-1031 Upper Baggage Door Seal Channel to the F-1006B Bulkhead as shown in figure 4. Step 5 Finally After placing Super Sound proofing material behind to fill the void, I riveted the F-1027 Close-Out Panel to the F-1026 Lower Baggage Door Seal.
Time about 3 hours.
Riveted the F-1026 Lower Baggage Door Seal Channel and the F-10100B Baggage Door Shim to Side Skin
F-1027 Close-Out Panel to the F-1026 Lower Baggage Door Seal.