Conrads X-10 Build Log
' style=
Date:  11-15-2009
Number of Hours:  5.00
Manual Reference:  33 -5 Step10 to 11
Brief Description:  Section 33 BAGGAGE AREA … Page 33 -5 Steps 10 t

Section 33 BAGGAGE AREA … Page 33 -5 Steps 10 to 11

The construction manual says that this is a good place to run any cables or wires under the seats and baggage floors. So I ran two fire proof ¾” conduits to snake the wires through.
I also continued with heat and sound insulation with a ½” layer of double insulation foil on the bottom and ½” of fire proof Super Sound proofing, for a combined total of 1 inch of heat and sound proofing glued to the bottom of the aircraft.


Step 10, I riveted the F-1022Baggage Stiffeners to both the F-1002A/L/R Baggage Floors with AN426AD3-3.5 rivets.

Step 11, Riveted the nutplates (both MS21051-L08 and K1000-08) to the F-1024 Seat Floors with AN426AD3-3.5 rivets.

Time about 5 hours because of the insulation task.
' style=

Fire Proof ¾” Conduits, Super Sound Proofing, over  Double Insulation Heat Foil

Fire Proof ¾” Conduits, Super Sound Proofing, over Double Insulation Heat Foil

' style=

Another View of the Fuselage Step 33-5

Another View of the Fuselage Step 33-5

' style=

The four tubes installed

The four tubes installed

' style=