Brief Description: Section 33 BAGGAGE AREA … Page 33 -5 Steps 10 t
Section 33 BAGGAGE AREA … Page 33 -5 Steps 10 to 11
The construction manual says that this is a good place to run any cables or wires under the seats and baggage floors. So I ran two fire proof ¾” conduits to snake the wires through. I also continued with heat and sound insulation with a ½” layer of double insulation foil on the bottom and ½” of fire proof Super Sound proofing, for a combined total of 1 inch of heat and sound proofing glued to the bottom of the aircraft.
Step 10, I riveted the F-1022Baggage Stiffeners to both the F-1002A/L/R Baggage Floors with AN426AD3-3.5 rivets.
Step 11, Riveted the nutplates (both MS21051-L08 and K1000-08) to the F-1024 Seat Floors with AN426AD3-3.5 rivets.
Time about 5 hours because of the insulation task.
Fire Proof ¾” Conduits, Super Sound Proofing, over Double Insulation Heat Foil