|
|
Conrads X-10 Build Log
|
Date: 11-14-2009
|
Number of Hours: 2.00
|
Manual Reference: 33 -4 Step 1 to10
|
Brief Description: Section 33 BAGGAGE AREA … Page 33 -4 Steps 1 to
|
|
Section 33 BAGGAGE AREA … Page 33 -4 Steps 1 to 10
Step1, Using the mighty Sears 2/3 hp bandsaw I slowly cut the F-1022 Baggage Floor Stiffeners into their B,C,D,E,F, and G components.
Step 2, not applicable to the Standard Build product.
Step 3, I clecoed the created F-1022 Baggage Floor Stiffners to the bottom of the F-1022A-L/R baggage Floors and then final drilled using a #40 drill bit.
Step 4, Final Drilled #40 the 3/32” holes in the aft flange of both F-1022A Baggage Floors.
Step 5, I Final-Drilled #30 the three rows of holes in the F-1022A Baggage Floors
Step 6, I debured the holes I created in the previous steps.
Step 7 through 10, I dimpled the #40 nutplates attachment holes, #19 holes and #30 holes as shown in figure 4
Time about 2 hours.
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |