KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  10-30-2009
Number of Hours:  3.00
Manual Reference:  31-9 Step 1 to 3
Brief Description:  Section 31 UPPER FORWARD FUSELAGE ASSEMBLY... Pag

Section 31 UPPER FORWARD FUSELAGE ASSEMBLY... Page 31-9, Step 1 to 3.

Step 1, I riveted theF-1044 Forward Fuse Rib Subassembly to the center F-1068A Sub-Panel Center with AN470AD4-4 rivets.

Step 2, I riveted the F-1068-L/R Side Sub-Panels to the F-1045-l/R Fwd Fuselage Rib with both AN470AD4-4 (seven places) and AN470AD4-5 (four places) rivets.

Step 3, Now I riveted the F-1071 Forward Fuselage Top Skin to the just completed Sub-Panel Forward Assembly using the rivets called out for in figure 2.

Time about 3 hours.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.