KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
< Previous Log Entry          Next Log Entry >
' style=
Date:  10-31-2009
Number of Hours:  2.00
Manual Reference:  31-10, Step 1 to 4
Brief Description:  Section 31 UPPER FORWARD FUSELAGE ASSEMBLY... Pag

Section 31 UPPER FORWARD FUSELAGE ASSEMBLY... Page 31-10, Step 1 to 4.

Step 1, I riveted the Instrument Panel Attach Flanges both F-1003C-L/R to the Top Skin.

Step 2, I riveted the Instrument Panel Attach Flanges both F-1003D-L and F-1003E-R to the
Top Skin.

Step 3, I riveted the two Hand Holds Doublers F-1071B to the Top Skin.

Step 4, After one more coat of DTM primer paint I installed the F-1003B Instrument Panel Lower Flange and F-1003 Instrument Panel to the assembly and placed the completed assembly in storage until later.

Time about 2 hours because of painting.
' style=





' style=




' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.