KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  8-8-2009
Number of Hours:  3.00
Manual Reference:  26-6 Steps 6 ..9
Brief Description:  Section 26 Mid. Fuselage Ribs and Bottom Skins. Pa

Section 26 Mid. Fuselage Ribs and Bottom Skins. Page 26-6 Steps 6 ... 9.
Step 6, clecoed then riveted the Left and Right Rear Seat Rib Subassemblies and the Rear Seat Ribs to the Fuse Bulkhead Assembly then riveted using the rivets called out in Figure 1.
Step 7, Riveted the Step Bracket to the Baggage Ribs using AN470AD4-4 rivets.
Step 8, Riveted the F-1021 L/R to the F-1018 L/R Outboard Rear Seat Ribs and the Fuselage Bulkhead Assembly with two “keeper” rivet until the fuselage skin can be applied. As shown inn figure 1.
Step 9, Dimpled the holes in common between the upper flanges of the inboard most Left and Right rear Seat Subassembly and the upper flange of the F-1043A Fuselage Bulkhead as described in Figure 1 Page 26-6.
Time about 3 hours.
' style=

Left and Right Rear Seat Rib Subassemblies and the Rear Seat Ribs to the Fuse Bulkhead Assembly

Left and Right Rear Seat Rib Subassemblies and the Rear Seat Ribs to the Fuse Bulkhead Assembly

' style=

Completed 26-6

Completed 26-6

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.