KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  9-12-2008
Number of Hours:  1.00
Manual Reference:  Section 11-9
Brief Description:  Empennage Attachment Section 11-9

/12/2008 .. Added the Trim Bell Crank and the Trim Servo Link Assembly as described in Steps 1 and 2. Then added the Trim Servo motor to the Trim Mount Bracket and The Trim Servo Sub-Assembly. As shown in Figure 3 and 4 and Steps 3 and 4. I then installed the two CT Q-43 Elevator Trim Cables through the Trim Cable Anchor Brackets F-1095G and assembled the product to the rotating Trim Bell Crank as described in Step 6 and Figure 5 on Page 11-09. Time about 1 hour.
' style=





' style=

Bell Crank Attachment Rod is in Place

Bell Crank Attachment Rod is in Place

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.