KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  9-11-2008
Number of Hours:  5.00
Manual Reference:  Section 11-8
Brief Description:  Empennage Attachment Section 11-8

/11/2008 .. Completed Steps 1 to 8 about the Trim Servo and associated Brackets as described on Page 11-8. Time about 2 hours.

Then I adjusted the Elevator Pushrod F-1091 to fit the 91.4 degree TEMPLATE as shown in Figure 1 and 2. Then threaded the jam nuts AN316-6 to the Rod End Bearing MD3614M to the Rudder as described in Figure 3 detail A. Next mounted the Rudder to the Vertical Stabilizer with the hardware shown in Figure 4. Checked the Rudder travel to 35 degrees as described in Step 5. Time about 3 hours.
' style=

Installed teh Servo adn Adjussted teh Push-Tube

Installed teh Servo adn Adjussted teh Push-Tube

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.