KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  9-10-2008
Number of Hours:  1.00
Manual Reference:  Section 11-6
Brief Description:  Empennage Attachment Section 11-6 Vertical Stab to

9/10/2008 … Add the Vertical Stab to the vertical stab Front Spar Attachment bracket VS-1016. And then added both Horizontal Elevators (L/R) to the Horizontal Stabilizer insuring that they still swing freely with no resistance. Created the push rod assembly from the 1 -12;” OD aluminum pipe F-1091. Riveted with MSP-42 and added the Rod End Bearings and adjusted as described in Figure 2. Time about 1 hour.
' style=

Vertical Stabilizer is Connected Correctly

Vertical Stabilizer is Connected Correctly

' style=

Cheecking for Corect Alignment

Cheecking for Corect Alignment

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.