KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  9-7-2008
Number of Hours:  3.00
Manual Reference:  Section 11-3
Brief Description:  Empennage Attachment Section 11-3

09/07/2008 …. Shaved the E-Drill Bushing found in the kit slightly with a fine file to have the desired 1/4” O.D. in order to fit into the VA-146 bushing. Then match drilled the Elevator Horn WD-605-L with a #19 (not #17) drill with the Elevator in the Normal Trailing position. Repeated the procedure with the Right Elevator. Then completed Steps 6 to 12 on page 11-3. Time about 3 hours.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.