KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  8-17-2008
Number of Hours:  3.00
Manual Reference:  Section10-17
Brief Description:  Tail Cone Section 10-17, Steps 1 to 6

8/17/2008 …. Completed steps 1 to 6 as shown. Found the Elevator Brackets F-635 and the VA-146 pulley. Then I final Drilled the parts as shown and created the Spacer F-635B. Then riveted the Elevator Bracket Assembly as shown in Figure2. Next step I riveted the F-1035 Battery/Bell Crank Plate as shown in Figure 3. Time 3 hours.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.