KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  8-17-2008
Number of Hours:  2.00
Manual Reference:  Section 10-18
Brief Description:  Tail Cone Section 10-18, Steps 1 to 3

8/17/2008 … Completed steps 1 to 3 about riveting. Riveted the F-1012A & B Bulkheads and the F-1056 Rudder Stop Brace and the F-1012E Tie Down Bar as specified in Figure 1. Riveted the Bulkheads F-1011, the F-1011A Bulkhead Stiffeners, the F1011C Horizontal Stabilizer Attachment Bars and the F-1011E Rudder cable Angle using the rivets as specified in Figure 2. Time about 2 hours.
' style=

Riveted F-1012A & B Bulkhead

Riveted F-1012A & B Bulkhead

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.