KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  8-16-2008
Number of Hours:  2.00
Manual Reference:  Section 10-16
Brief Description:  Tail Cone Section 10-16 Steps 1 to 8

8/16/2008 … Completed steps 1 to 8b as shown on page. (IN PROGRESS)

Create the three F-1036 Battery Channel into two F-1036 B and one F-1036 A. Then Final Drilled the holes in F-1036-B and also Final Drilled the F-1035 Battery/Bell Crank Mount as shown in Figure 3.
' style=

F-1036 Battery Channel into two F-1036 B and one F-1036 A.

F-1036 Battery Channel into two F-1036 B and one F-1036 A.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.