Brief Description: Tail Cone Section 10-16 Steps 1 to 8
8/16/2008 … Completed steps 1 to 8b as shown on page. (IN PROGRESS)
Create the three F-1036 Battery Channel into two F-1036 B and one F-1036 A. Then Final Drilled the holes in F-1036-B and also Final Drilled the F-1035 Battery/Bell Crank Mount as shown in Figure 3.
F-1036 Battery Channel into two F-1036 B and one F-1036 A.