Conrads X-10 Build Log
' style=
Date:  7-6-2008
Number of Hours:  6.00
Manual Reference:  Page 9-5, 9-6
Brief Description:  Horizontal Elevator Sections 9 Pages 9-5 to 9-6

07/06/2008….Attached E-1008 Ribs to the E-1001B and E-615, E-1015 Trims access and the E-921 corner angle bracket. Sections 9-5 to 9-6. Time about 3 hours.