KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  1-7-2010
Number of Hours:  1.00
Manual Reference:  OP37-4 Step 1 to 3
Brief Description:  Section OP37- RV-10 WIRING HARNESS Page OP37-4 Ste

Section OP37- RV-10 WIRING HARNESS Page OP37-4 Steps 1 to 3

Step 1, I made the WH-800A Terminal Block as shown in figure 1.

Step 2, I mounted the WH-800A Terminal Block to the F-1068A Sub Panel and Sub-Panel Side using the hardware called ou7t for in figure 2.

Step 3, Fabricated the P21 and P22 electrical Buss Bats from the .063X0.5X12 copper plate as shown in figure 4 and 5.

Step 4, After manufacturing the two Buss Bars I mounted them to the back side of the plain type circuit breakers and Toggle circuit breakers.

Time 1 hour
' style=

ection OP37- RV-10 WIRING HARNESS Page OP37-4 Steps 1 and 2

ection OP37- RV-10 WIRING HARNESS Page OP37-4 Steps 1 and 2

' style=

WH-800A Terminal Block to the F-1068A Sub Panel and Sub-Panel Side

WH-800A Terminal Block to the F-1068A Sub Panel and Sub-Panel Side

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.