KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  9-26-2009
Number of Hours:  3.00
Manual Reference:  29-13 Step1 to10
Brief Description:  Section 29, FUSELAGE SIDE SKINS …. Pages 29-13, St

Section 29, FUSELAGE SIDE SKINS …. Pages 29-13, Steps 1 to 10

Step 1,2,3,4,5, and 6 ……. I Match Drilled #40 , #30, #12 and #19 all the holes in common of the F-1069 Fwd Fuse Side Skin –L/R.

Step 7, I Final Drilled #30 all the holes in common between the F-1042-L/R Bulkhead Side Channels and the F-1042E-L/R Gussets the Final Drilled #30 the holes in the gussets into the upper Flange of the F-1040-L/R Upper Fuse Channels.
Step 8, Final Drilled #40 the holes in common between both the F-1015C-L/R Mid Cabin Decks and the Bulkhead Side Channels.

Step 9, Then Final-Drill #40 the holes in common between the forward tabs on the F-1088-L/R Fwd Fuselage Rib and inboard flange of the F-1002-L/R Fwd Fuselage Bulkhead. And Final Drilled #30 the five holes in common between the fwd fuse ribs and the web of the bulkhead side channel.

Step 10, Finally I Match-Drilled #30 the holes in the lower tab of the F-1002-L/R Fwd Fuselage Bulkheads into the Lower Fuse Channels.

Time about 3 hours.
' style=

Final and Match Drilling the RT Side Skin

Final and Match Drilling the RT Side Skin

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.