Date:  12-1-2007
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Wiring & plumbing completed - Engine pre-oiled

All the plumbing and wiring were completed today. Keith decided he liked the P leads exiting from the top fire wall penetration with the EIS wires and not down with the starter and battery wires. It does look a little neater but both were functional. See Image #1. You can also see that the scat tubes to the rear baffle and the heater box were installed. Next we preoiled the engine. Image #2 shows that the oil cooler is now plumbed. It took just a few turns of the starter to get oil through the cooler and out into the oil pressure sensor. The oil pressure came right up!
' style=

Wiring & plumbing complete

Wiring & plumbing complete

' style=

Engine pre-oiled

Engine pre-oiled

' style=