Brief Description: Drilled, tapped, fit empennage gap fairings
We finished putting the cotter pins in the rudder pedal connectors. I had bought a 6-32 tap and borrowed a handle so that we could tap the longerons under the vert. stab. so that we could anchor the gap fairing there. The handle didn't work so I had to borrow one from Trent Cady. I drilled out several rivets and then drilled the holes to #36 drill size and tapped them. Claude began working on fitting the left gap fairing with the 1/16th gap. We also began working on the enpennage inspection cover. Nothing very exciting today but little stuff that had to be done. It was 29 degrees when we got to work so it was cold but we still rode our bikes approx 2.5 miles.