KitLog pro

Powered By Kitlog Pro v2.0

Cleve's Web Site
' style=
Date:  9-22-2006
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Both seat backs completed--Control rod tunnel fabr

I finished assembling the left seat back and riveting it together while Claude finished fabricating the control rod tunnel. He drilled and screwed the supports into place and I riveted the nut plate on the forward set floor. Monday, we have to drill the tunnel cover to the brackets and the take it apart again and prime it before we can rivet it finally. We will then move to the space forward of the wing spar and fix several cover plates.
' style=

Both seat backs completed

Both seat backs completed

' style=

Control rod tunnel fabricated

Control rod tunnel fabricated

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.