KitLog pro

Powered By Kitlog Pro v2.0

Chris's RV-14A Site
' style=
Date:  9-27-2016
Number of Hours:  7.00
Manual Reference:  30, 31
Brief Description:  Finish fuselage mating and starting fuel

Completed the riveting of the rear fuselage mating - just needed to add the seat belt attachments to the top skins and rear bulkheads. Moving now to section 31 fuel which is installation of the fuel and brake routing brackets with pull rivets and then preparing and installing the fuel valve, fuel pump and filter. The pump need to have some connectors crimped on so the electrical supplies are needed before starting this step.
' style=

Seat belt retainer riveted

Seat belt retainer riveted

' style=

Fuel and return line Unused) brackets installed

Fuel and return line Unused) brackets installed

' style=

Fuel valve and pump/filter installed

Fuel valve and pump/filter installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.