Built battery box with the countersink extension and drill press and added nut plates to sides. Added the firewall pass through stainless pieces to the firewall and sealed with tank sealant. Trial fitted the firewall assembly to the floor section prior to riveting. Next session will be applying tank sealant to the firewall flanges and riveting the firewall to the floor .