KitLog pro

Powered By Kitlog Pro v2.0

Chris's RV-14A Site
' style=
Date:  8-17-2016
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Front floor pan and tunnel work

Working on the stainless tunnel in the forward fuselage. Riveted the stainless center ramp and fuel pump brackets to the sides. Once the ramp is riveted on, it gets sealed with tank sealant to keep any leaks or vapors from the cabin. The heater valve doors are fabricated from hinge material and some stainless plates. Pretty staright forward and the are riveted together. The heater valve housings go together with pull rivets.
' style=

Heater valve clecoed to firewall

Heater valve clecoed to firewall

' style=

Tank sealed tunnel parts

Tank sealed tunnel parts

' style=

Heter valve assemblies

Heter valve assemblies

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.