Date:  8-16-2016
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Forward floor assembly started

Started assembling the bottom forward floors by riveting the antenna doublers and floor stiffeners. Backriveting these parts is a breeze. Next, the stainless ramp sides get riveted to the floor sides after a bead of tank sealant is put down to seal these from the cabin. A small batch of parts was deburred and primed for assembly later.
' style=

Ramp clecoed to riveted sides

Ramp clecoed to riveted sides