KitLog pro

Powered By Kitlog Pro v2.0

N19MM Contruction Log
' style=
Date:  12-26-2005
Number of Hours:  1.00
Manual Reference:  6-2
Brief Description:  HS Steps 25 - 27

Step 25 - Using the dimensions showing in SEC D-D I marked and drilled attach holes for the HS-405 rib. These go through the HS-710 and HS-714 reinforcement angles, so you have to make sure there will be enough edge clearance on those angles when drilled through (done later). You can see I adjusted from my measurements a little to get straighter line of holes - picture 1.(Starting the LEFT horizontal stab - these steps will be repeated for the RIGHT horizontal stab).Step 26 - Cleco'ed all of the ribs and spars together, except the HS-405 we just drilled and HS-404 (inboard front nose rib). See picture 2.Step 27 - Drilled all of the attach holes to #30.
' style=

HS-405 measured and drilled

HS-405 measured and drilled

' style=

Ribs clecoed

Ribs clecoed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.