To day I received that parts I ordered for the primer system, so I finished up the installation. In that order there was a hose, 90*, and 45* fitting (along with some other parts I needed elsewhere).
I played around with the fittings and the best routing worked out to be with the 45* at the primer distribution block and the 90* at the valve. Once I was happy with the routing I removed the distribution block and installed the compression fittings using pro-seal.
I installed the fittings in the primer valve and mounted it to thr bracket. I had been using a couple temporary screws to hold it in place, but it was time for those to go. I drilled the head of a couple stainless socket-head cap-srews so they would accept saftywire. I installed them with a plan and split lock washer and then saftied them in place.
I reinstalled the primer parts and connected all the lines.