Put a new blade in my tubing cutter and cut the static tubes to final length from ports to center fitting. Left the run to the ADAHRS bracket long. Spent time planning the run for the pitot and AoA lines from the wing to the ADAHRS. Looked at several possible paths, but will talk it over with Ken and others before I start drilling. Marked possible locations for holes to pass the tubes through the bulkheads.