KitLog pro

Powered By Kitlog Pro v2.0

Carl Bells RV7A N947CB
' style=
Date:  2-6-2009
Number of Hours:  5.00
Manual Reference:  GRT Manual
Brief Description:  Fuel flow mounting and plumbing

This probably does not look like anything significant, but the time it took time to find a way to get 5" of straight tube into the fuel flow sensor and 3" of straight tubing after the sensor was significant. This is a requirement for accurate reading. I tried at least three different locations to get it right, and I believe this location is the only practical solution, so other builders with I/O 360s, this is the best way, trust me! Wiring and wire routing is next for this very important system, stay tuned.
' style=

The perfect spot as if there is any other place to put it.

The perfect spot as if there is any other place to put it.

' style=

Better viiew

Better viiew

' style=

Big picture view

Big picture view

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.