KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 Build Log
< Previous Log Entry          Next Log Entry >
' style=
Date:  6-19-2014
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Electrical - SWB/CB Installation

With the cabin fuel system put to bed, except for the cradle bracket for the boost pump. decided to proceed with the electrical system.

• Used a template provided by Vans for the SWB/CB install to mark and drill the console cover.
• Used Unibit to final drill the holes for the SWB/CB.
• Installed the SWB/CB as I think I will use them for the RV8.
' style=

Template provided by Vans in Electrical Kit

Template provided by Vans in Electrical Kit

' style=

Unibit to drill holes for SCB and CB to final size

Unibit to drill holes for SCB and CB to final size

' style=

SWB and CB Installed in right SCB/CB console

SWB and CB Installed in right SCB/CB console

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.