After installing all of the grommets into the plexi bubble, installed both the left and right fibreglass skirts in place very carefully, so as not to lose any of the grommets in the plexi bubble pre-drilled over-sized holes for the ACQQ4-4 rivets.
Starting the riveting on the left side skirt, using the ACQQ404 for the top row of rivets to enable easy drill-out should it be necessary to replace the canopy.
Ken riveted the bottom section witht the CS4-4 rivets, consisting of the bottom frame rail and ribs.
Right Side Skirt in place with Grommets
Left Side Skirt in place, cleco the top with ACQQ4-4