Powered By Kitlog Pro v2.0
My RV-8 Build Log
RV-8
Canopy
8-28-2013
< Previous Log Entry
Next Log Entry >
Date:
8-28-2013
Number of Hours:
3.00
Manual Reference:
44
Brief Description:
Rivet Canopy Skirts Right Side
Performed final riveting for the canopy skirt on the right side, the rear of the canopy skirt and left side remains to be riveted. ACQQ4-4 on the top of the skirt where the plexi bubble is sandwiched, CS4-4 elsewhere.
Riveting the left side skirt
Riveting all done left side
Riveting all done right side
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
876
2687
Ailerons and Flaps
1
5
Avionics
61
194
Baggage Door
1
3
Brake System
17
34
Cabin
7
40
Canopy
44
138
Cowl
56
180
DAR Inspection
1
3
Electrical
97
275
Empennage
97
342
Engine
122
322
Fairings
54
153
First Flight
1
2
Flight Control
17
46
Flight Training
2
10
Fuel System
34
106
Fuselage
98
299
Instrument Panel
17
60
Interior
13
42
Landing Gear
8
18
Lighting
10
26
Markings, Placards a
2
4
Miscellaneous
14
66
None
1
Paint and Prep
8
24
Phase I
1
2
Pitot/AOA
2
6
Post DAR Inspection
3
14
Prop
15
46
QB Kit
2
9
Static Pressure Syst
4
10
Tech Councilor Visit
1
2
Tech Inspection
1
2
Tires
1
1
Transition Training
1
10
Weight and Balance
1
3
Windscreen
27
75
Wings
34
115
Copyright © 2001-2024 Matronics. All Rights Reserved.