KitLog pro

Powered By Kitlog Pro v2.0

Bill's RV-14A Project
' style=
Date:  4-28-2012
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Spray Booth Structure Setup

I made a box frame to hold the box fans and attached it between two of the horizontal braces. On the other side I took a piece of 1/2 inch plywood and cut two square holes about the size of the furnace filters. I attached the plywood to the box frame. This allows the filters to be held in place by the box fans.
' style=

Box Fans in Place

Box Fans in Place

' style=

Filters Installed

Filters Installed

' style=

Wood Structure Almost Complete

Wood Structure Almost Complete

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.