KitLog pro

Powered By Kitlog Pro v2.0

Bill's RV-14A Project
< Previous Log Entry          Next Log Entry >
' style=
Date:  11-23-2013
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Empennage Hardware Organized

I went through all the hardware bags (29 in all) and separated everything into individual storage bins. I used my labeler to make labels to indicate the bag number and part number. The labels are stuck onto strips of a file folder that I cut to fit the spot in the front of the storage bins to hold it.

There are 96 open storage bins and all but one has something in it. Several of the enclosed storage containers also have parts in them.

This will defintely keep the small parts organized, within easy reach, and easily identifiable.

So now I have no excuse not to get started building the empennage. The first sub-componenet is the vertical stabilizer.
' style=

Hardware Bags

Hardware Bags

' style=

Storage Bins

Storage Bins

' style=

Small Parts Storage

Small Parts Storage

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.