Installed 6X6 pieces of 4 ply bid made yesterday over door hinges. Riveted and epoxied into place. Sanded and microed overhead, door posts, and overhead beams.
Made final fit on rear seat and decided to move pilot side back about an inch. Installed seat belts for fit. Structural epoxied rear seat back stop and support into position. Structural epoxied seat bottom brackets into place. Installed hard point for center seat support with cabo, flox and 2 bid.