Installed CHT sensors in holes provided by TCM. Temporarily installed exhaust pipes. Determined positions for EGT sensors to allow for the best wire routing along engine mount. Drilled 1/8 " hole in each pipe and installed sensors.
Wayne fabricated an aluminum bracket for the GRT EIS box that is to be mounted on firewall.