KitLog pro

Powered By Kitlog Pro v2.0

BILL'S WEB SITE
' style=
Date:  3-13-2019
Number of Hours:  0.75
Manual Reference:  
Brief Description:  Fuselage Bottom Layups - Clean up

I removed the peel-ply from the floor layups. I they used some 80 grit on a soft pad and sanded some of the peel-ply edges down. The layup came out nice. There were just a couple small delams that developed. One on the edge where the IP will bond to it and a couple at the back edge of the front seat pocket. Both of these areas will have additonal BID tapes added to connect the Seat Back and IP to the floor. I sanded these delams flat and will drill and fill the voids with resin.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.