KitLog pro

Powered By Kitlog Pro v2.0

BILL'S WEB SITE
' style=
Date:  3-9-2019
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Fuselage Floor Inside Layups

Layed up the fuselage floor per plans. I stated by filling any defects in the foam with dry micro. I then mixed up some micro slurry to seal the foam. I then proceeded with the two ply bid layups. I added a third ply to the passenger floor area per plans. Peel Ply was added over the complete floor layup. I used slow hardener which was good as this was a little bit of a marathon session. No issues.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.