Powered By Kitlog Pro v2.0
Edwards Web Site
RV-14A
All
5-5-2022
< Previous Log Entry
Next Log Entry >
Date:
5-5-2022
Number of Hours:
12.00
Manual Reference:
Brief Description:
Main Landing gear installation
Installed the main landing gear into the fuselage assembly. Added the axles and measured for toe alignment. Added a 1/2 deg shim on each side to bring the toe-in to within 0.25 deg. Installed wheels, brakes and brake lines.
Inside mount
Left main gear with brake line
Right side close-up
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-14A Home
Category
# Logs
# Hours
All
233
1304
Avionics
2
60
Empennage
59
200
Engine
6
34
Fuselage
97
626
Miscellaneous
5
33
Wings
64
351
Copyright © 2001-2024 Matronics. All Rights Reserved.