KitLog pro

Powered By Kitlog Pro v2.0

Edwards Web Site
' style=
Date:  5-5-2022
Number of Hours:  12.00
Manual Reference:  
Brief Description:  Main Landing gear installation

Installed the main landing gear into the fuselage assembly. Added the axles and measured for toe alignment. Added a 1/2 deg shim on each side to bring the toe-in to within 0.25 deg. Installed wheels, brakes and brake lines.
' style=

Inside mount

Inside mount

' style=

Left main gear with brake line

Left main gear with brake line

' style=

Right side close-up

Right side close-up

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.