Powered By Kitlog Pro v2.0
Edwards Web Site
RV-14A
All
2-23-2021
< Previous Log Entry
Next Log Entry >
Date:
2-23-2021
Number of Hours:
2.50
Manual Reference:
Brief Description:
Assembled rudder pedals
Assembled the powder coated rudder pedal parts and added them to the frames. Prepared the plastic bearings that attach the frames in the fuselage
Assembled rudder pedals
Other side
Added to rudder pedal frames
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-14A Home
Category
# Logs
# Hours
All
233
1304
Avionics
2
60
Empennage
59
200
Engine
6
34
Fuselage
97
626
Miscellaneous
5
33
Wings
64
351
Copyright © 2001-2024 Matronics. All Rights Reserved.