KitLog pro

Powered By Kitlog Pro v2.0

Edwards Web Site
' style=
Date:  8-2-2019
Number of Hours:  4.00
Manual Reference:  9
Brief Description:  Elevator and tailcone work

Rolled the leading edges of the elevators and riveted them together. Used a 1" PVC pipe and tape. Worked out pretty well. Continued to deburr, dimple and prime parts for the tailcone. Was able to start the assembly of the aft tailcone bulkhead which includes the rear tie-down bracket. I plan to go to my first EAA meeting tomorrow at McKinney Texas Airport.
' style=

Rolled and riveted elevator leading edges

Rolled and riveted elevator leading edges

' style=

Primed tailcone parts

Primed tailcone parts

' style=

Assembled aft tailcone bulkhead

Assembled aft tailcone bulkhead

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.