KitLog pro

Powered By Kitlog Pro v2.0

BOB'S WEB SITE
' style=
Date:  8-28-2020
Number of Hours:  2.00
Manual Reference:  Section 37
Brief Description:  Preparing to drill side hinges to top cowling

I had to go to the hangar to clean and dispatch the camper to a renter for the weekend so I did a little work on the cowling. Notching a cutout for the hinge pin tabs in the top cowling. I don't really like the look of this because you have to take a pretty good size notch out of the top canopy to be able to pull the pin straight out. But I did it. Whatever. I didn't want a Bronze Lindy anyway.

Then I measured 9/16" up from the bottom of the top cowling to mark rivet holes for the top hinge, removed the cowling and drilled the holes in the cowling, then put it back on.

I decided to match drill into the hinge material on another day.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.