Over several days prepped up the tunnel covers (prime and paint) then installed the bracket, riveting it to the front and back after rigging up the spring slide on the bracket. Installed. Threaded the throttle cable through the firewall (after installing the grommet) but had to stop because the nuts are metric and I didn't have metric wrenches at the hangar.