KitLog pro

Powered By Kitlog Pro v2.0

BOB'S WEB SITE
' style=
Date:  7-20-2020
Number of Hours:  4.00
Manual Reference:  Section 46
Brief Description:  Heat shield and fuse box

The camper came back trashed as a renter bent the bed rails. That was a major pain in the neck to get off and then I spent all day fixing it. Patrick came by after his night softball game to help lift it back into place, which gave me a little time to close the day out working on the plane. I smeared red RTV over the black RTV and put some heat foil on the bottom. Then studied the information in the plans to get it positioned exactly right before safety wiring it into place. It protects the ignition coils.

Then I dug out the Rotax fuse box, which is an impressive bit of engineering, and drilled the four mounting holes to #12 to allow it to be temporarily mounted. First I attached ground wires from Lane A, although the instructions say to clip and heat shrink one of the wires.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.