KitLog pro

Powered By Kitlog Pro v2.0

BOB'S WEB SITE
' style=
Date:  8-5-2018
Number of Hours:  3.00
Manual Reference:  Section 29
Brief Description:  Began work on upper firewall

I prepped up the doubler strip, drilling out the holes to a #7 deburring, and dimpling, and countersunk all the nutplate attach holes. Then riveted the nutplates and strip to the firewall as directed. I have a little confusion about the short pieces on the ends so I waited on those.

I was only able to make the 25 7/8 " hinge piece but I fit that on and then drilled the holes to that, leaving 1/6" of it above the flange of the firewall as directed.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.