Powered By Kitlog Pro v2.0
BOB'S WEB SITE
RV-12iS
All
4-18-2018
< Previous Log Entry
Next Log Entry >
Date:
4-18-2018
Number of Hours:
2.00
Manual Reference:
Section 24
Brief Description:
Side rollbar support
(multiple sessions)
I riveted the rollbar to the "B" and "C" strips with the exception of the rivet holes called out in the instructions.
I drilled and tapped the holes for the canopy latch assembly and then riveted as instructed.
I separated the pieces for the side rail support brackets, primed them, and gave them a shot of the hammered finish paint.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-12iS Home
Category
# Logs
# Hours
All
400
797
Electrical
6
12
Empennage
57
111
Engine
38
78
Finishing Kit
97
183
Fuselage
131
255
Hardware
1
2
Miscellaneous
3
6
Prop
16
20
Tools
1
2
Wings
50
128
Copyright © 2001-2024 Matronics. All Rights Reserved.